The complete renewal of the control on crane systems is often a sensible solution if the basic substance of old systems is in order. Customer-specific modernization solutions require a high degree of flexibility. Weather the assembly of new control cabinets or an exchange of the assembly fields step-by-step, the use of PLC controls or a classic control is required or avoided, depends on conditions of the crane system.
We modernize your crane control from the individual drive to the entire control cabinet.
Above before conversion, below after conversion
Special features of our crane controls:
- Maximum safety thanks to encoder-fed hoists
- According to customer requirements, drives with high protection class IP66 mounted externally
- Modern control components Siemens S7-300
- Control cabinet with removable doors in all special sizes
- Complete control cabinet air conditioning
- Seamless integration into the existing systems, e.g. radion control, magnet system
Mounting plate for crane travel